If you’ve read any of my previous posts, you’ll know that we’re installing a ground source heat pump as part of our barn conversion. Well, the installation of the ground loop collector pipes started in the last couple of days and I siezed the opportunity to shoot some short timelapse videos of the work being done.
The videos linked below show how the 50m x 1m x 1m trenches are dug and how the 200m of pipe loop in each trench is laid as 1m diameter coiled “slinkies” on a bed of 100mm sand. The videos are only short (they were shot with a 15 second interval between each timelapse frame) but are HD so make sure to select the 720p HD option on playback.